www
Skip to Content Navigation

Please provide your question and email address in the fields below. Note, all fields are required.

Your question has been successfully submitted. Thank you.

One tower located at Bowsman School – 401 – 4th Avenue, Bowsman, MB
One tower located at Birch River School – 210 – Drury Avenue, Birch River, MB

Swan Valley School Division Quote
Dismantle two communication towers and attached equipment

Quote Addendum No. 1 – Dated May 30, 2018

Successful bidder to supply Workers Compensation Board of Manitoba Clearance
letter (proof of coverage). Coverage to be in force when work is completed.
One tower located at Bowsman School – 401 – 4 th Avenue, Bowsman, MB
One tower located at Birch River School – 210 – Drury Avenue, Birch River, MB

SVSD is accepting quotes to dismantle/take down the above towers and equipment. Cement
base to remain. Tower bases to be cut flush with the cement such that no sharp edges remain.
Work to be completed by July 31, 2018 or as mutually agreed and when school is not in session.
Also looking for an offer for each tower, if interested in purchasing them, as is where is. We
make no representation to age, condition, etc., of each tower. If interested in purchasing the
equipment and cables currently on each tower, please submit a bid describing items being
considered.

The contractor shall be responsible for the protection of all existing site features, including landscaping, paving, sidewalks, etc., and for the protection of all exterior and interior building elements. The contractor shall make good any damage to these elements caused by any portion of the work including the failure to provide protection from inclement weather. 

The contractor shall comply with the Provincial/Federal regulations on construction safety measures under the Workplace Safety and Health Act and Regulations for Construction Projects, erect/dismantling of towers, etc., the local authority having jurisdiction, and all other applicable codes and by-laws.

Contractor’s Comprehensive Liability Insurance: To protect himself and indemnify and save
operations under contract. Minimum comprehensive coverage to be $2,000,000.00. Owner
harmless from any and all claims which may arise from the contractors. Successful bidder to add
Swan Valley School Division as an additional assured.

The bidder should examine the project site before submitting a bid, either personally or through a representative and shall satisfy himself as to the nature and location of the work, local
conditions, the equipment and facilities needed preliminary to and during the prosecution of the
work, the means of access to the site, on-site accommodation, all necessary information as to
risks, contingencies and circumstances which may affect his bid and all other matters which can
in any way affect the work. The bidder is fully responsible for obtaining all information required
for the preparation of the bid, as well as any permits/fees that may be applicable.

The Division will be responsible for removal of the cement base, but the successful bidder must ensure there are no protrusions, sharp edges, anchor bolts, etc., protruding creating a hazard. Also must weather proof the holes in the building when/if any cables have been removed. All work to be coordinated/scheduled with the Division at times mutually agreed to. The owner reserves the right to accept the bid which is deemed most advantageous. The lowest bid to dismantle and the highest bid to purchase the surplus towers, equipment, cables or any bid will not necessarily be accepted. 

Please submit your bid by 12 Noon on Friday, June 1, 2018.

Brent Rausch, Secretary-Treasurer, Swan Valley School Division, Box 995, 1481 3rd Street
North, Swan River, MB R0L 1Z0.

Bids maybe mailed or delivered to the above address, faxed (204-734-2273) or emailed to
brausch@svsd.ca.

Call for Quote - Dismantle two communication towers and attached equipment

One tower located at Bowsman School – 401 – 4th Avenue, Bowsman, MB
One tower located at Birch River School – 210 – Drury Avenue, Birch River, MB

Swan Valley School Division Quote
Dismantle two communication towers and attached equipment

Quote Addendum No. 1 – Dated May 30, 2018

Successful bidder to supply Workers Compensation Board of Manitoba Clearance
letter (proof of coverage). Coverage to be in force when work is completed.
One tower located at Bowsman School – 401 – 4 th Avenue, Bowsman, MB
One tower located at Birch River School – 210 – Drury Avenue, Birch River, MB

SVSD is accepting quotes to dismantle/take down the above towers and equipment. Cement
base to remain. Tower bases to be cut flush with the cement such that no sharp edges remain.
Work to be completed by July 31, 2018 or as mutually agreed and when school is not in session.
Also looking for an offer for each tower, if interested in purchasing them, as is where is. We
make no representation to age, condition, etc., of each tower. If interested in purchasing the
equipment and cables currently on each tower, please submit a bid describing items being
considered.

The contractor shall be responsible for the protection of all existing site features, including landscaping, paving, sidewalks, etc., and for the protection of all exterior and interior building elements. The contractor shall make good any damage to these elements caused by any portion of the work including the failure to provide protection from inclement weather. 

The contractor shall comply with the Provincial/Federal regulations on construction safety measures under the Workplace Safety and Health Act and Regulations for Construction Projects, erect/dismantling of towers, etc., the local authority having jurisdiction, and all other applicable codes and by-laws.

Contractor’s Comprehensive Liability Insurance: To protect himself and indemnify and save
operations under contract. Minimum comprehensive coverage to be $2,000,000.00. Owner
harmless from any and all claims which may arise from the contractors. Successful bidder to add
Swan Valley School Division as an additional assured.

The bidder should examine the project site before submitting a bid, either personally or through a representative and shall satisfy himself as to the nature and location of the work, local
conditions, the equipment and facilities needed preliminary to and during the prosecution of the
work, the means of access to the site, on-site accommodation, all necessary information as to
risks, contingencies and circumstances which may affect his bid and all other matters which can
in any way affect the work. The bidder is fully responsible for obtaining all information required
for the preparation of the bid, as well as any permits/fees that may be applicable.

The Division will be responsible for removal of the cement base, but the successful bidder must ensure there are no protrusions, sharp edges, anchor bolts, etc., protruding creating a hazard. Also must weather proof the holes in the building when/if any cables have been removed. All work to be coordinated/scheduled with the Division at times mutually agreed to. The owner reserves the right to accept the bid which is deemed most advantageous. The lowest bid to dismantle and the highest bid to purchase the surplus towers, equipment, cables or any bid will not necessarily be accepted. 

Please submit your bid by 12 Noon on Friday, June 1, 2018.

Brent Rausch, Secretary-Treasurer, Swan Valley School Division, Box 995, 1481 3rd Street
North, Swan River, MB R0L 1Z0.

Bids maybe mailed or delivered to the above address, faxed (204-734-2273) or emailed to
brausch@svsd.ca.